My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE104930
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE104930
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:58:02 PM
Creation date
11/24/2007 11:44:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000113
IBM Index Class Name
Permit File
Doc Date
8/17/2001
Doc Name
DRAINAGE STUDY ROARING FORK RESOURCES INC MAMM CREEK SAND & GRAVEL PIT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />9. The estimated storage volume for the surface facility detention pond is: <br /> Volume, cu. ft. <br /> 10 yr - 24 hr 25 yr - 24 hr 100 yr - 24 hr <br />Storage 5,587 7.988 11,361 <br />Runoff 15,383 2.1.800 35,340 <br />' The estimated dimensions across the top of [he detention pond aze 1 l0 feet by 110 <br />feet. The pond has been sized using a 3:1 slope. <br />' 10. The calculated capacity for the discharge using the historic 25 yr. runoff is a 12" <br />PVC pipe that is fitted with an orifice. The emergency spillway has been sized to <br />handle the 100 yr. event and has the following dimensions: <br />1 <br /> <br /> <br />1 <br /> <br />1 <br /> <br /> <br />1 <br /> <br /> <br />Description Feet <br />Bottom of Ditch 2.50 <br />Depth of Flow I.00 <br />Ditch Width -Top of Flow 7.50 <br />Ditch Width -Top of Ditch 9.00 <br />Freeboazd 0.30 <br />Ditch Side Slope 2.x:1 <br />Velocity, fps 3.14 <br />[t is recommended that the emergency spillway be lined with a riprap having a Dso <br />of 6 inches. A geotextile fabric should be placed between the soil and riprap for <br />all applications. <br />11. [t is recommended that a diversion ditch be constructed in the CDOT right-of way <br />to divert the storm water runoff from the I-70 corridor azound the Dry Creek <br />surface facility area. The diversion ditch contains a flatter section from the <br />culvert inlet to the top of the slough bank and the slough bank. The diversion <br />ditch cross sectional area for the flatter section of the ditch is: <br />Description Feet <br />Bottom of Ditch 3.00 <br />Depth of Flow 1.90 <br />Ditch Width - Top of Flow 14.40 <br />Ditch Width -Top of Ditch 16.20 <br />Freeboazd 0.30 <br />Ditch Side Slope 3:1 <br />Velocity, fps 2.46 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.