Laserfiche WebLink
<br />- Does the peroxide price include delivery to site; <br />- Include cost (usually rental) of peroxide injection system; <br />- Include cost of pumps and one backup pump; <br />- Include peroxide contingency, should the projected 149 t,arrels be <br />insufficient. We suggest adding 74 more barrels; <br />- Include cost of sample preparation and analysis. <br />(s~ ~+~ ~ 95. Please include the cost of performing site reclamation at the test heap <br />~j ~' area, including detoxification, grading, facility removal, to~~soil <br />replacement, and re vegetation. <br />' 96. Please include the cost of reclamation at the ESI heap, including pool <br />' removal, pond grading, topsoil replacement and re vegetation. <br />97, Please include the cost of reclaiming the Borrow Area, including grading, <br />topsoil replacement and re vegetation. <br />98. Please include the cost of monitoring well abandonment. <br />99. The cost of seed should be for pounds Pure Live Seed (PLS). f~lease state <br />whether the estimated costs is for pods of seed or seed adju~.ted to <br />pounds PLS. ,~ <br />2219E/scg <br />-1 7- <br />