My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE104783
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE104783
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:57:55 PM
Creation date
11/24/2007 11:32:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981275
IBM Index Class Name
Permit File
Doc Date
12/26/2001
Doc Name
CIRCES COST ESTIMATING SOFTWARE COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 26-Dec-2001 Permit or job no.: M-1981-275 <br />User : KAP Abbreviation : none <br /> Filename : M275-000 <br />Agency or organization name :Colorado Division Of Minerals And Geol <br />Permit or job action :permit application <br /> <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />001 -mobilize/demobilize mobilize 1 4.6 $697 <br />002 -Grade Highwall dozer 1 75.3 $10,360 <br />003 -Grade Topsoil dozer 1 229.5 $31,572 <br />004 -revegetation revege 1 25.0 $10,351 <br /> <br /> i <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />I <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> I <br />iii iuiiiiiiiiiiiii <br />999 <br />Site :Stout-Amick Pit <br />State :Colorado <br />County :Rio Blanco <br />includes inllation factor adWsimeni of : NA <br />OVERHEAD AND PROFIT <br />Liability insurance <br />Performance bond <br />Job superintendent <br />Profit <br />1.55 <br />1.05 <br />167.23 <br />10.00 <br />' I <br />suerorALS 334.4 $52,980 <br />TOTAL DIRECT COST'=~ $52,980 <br /> <br />°6 of direct total = $821 <br />°b of direct total = $556 <br />hrs'...$/hr $33.50 total = $5,602 <br />°5 of direct total = $5,298 <br />'assume net hours = 50% of task Hours TOTAL O 8 P . $12,278 <br /> CONTRACT AMOUNT (dyed . O 8 P) _ $65,256 <br />PRLUECT t.`ANAGEMES'. <br />Engineering work and/or contracUbid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of Intr. NA total = $3.263 <br />CONTINGENCY- NA~ NA total= NA <br />convngences accounted for al task revel TOTAL INDIRECT COST= $1$,$41 <br />TOTAL BOND AMOUNT (direct + indirect) _ $68,521 <br />
The URL can be used to link to this page
Your browser does not support the video tag.