Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />`I- <br />Project: Haul Road Y-A Project No.: 95-2384 <br />Location: Hayden, Colorado Report No.: 9 <br />Client: Seneca Coal Company <br />Work Performed: <br />Date: 8/22!95 <br />Time: 2.0 <br />Mileage: 34 <br />Engr./Tech: JK <br />As requested, we visited the project site and conducted nuclear density test No.'s 28 through 29 on the material <br />being placed for subgrade fill. <br />At the time of our visit, the contractor was cutting material from the on-site borow area north of Sta. 3+00 to Sta. <br />7+00 and placing and compacting material from Sta. 21+00 to Sta. 25+00. <br />Remarks: <br />The material tested generally met project specifications with moisture contents being within 3% of optimum. <br />Please refer to the attached sheet for results of today's testing. <br />Verbal Discussions: <br />Chuck McCulloh of Seneca Coal Co. was notified of today's test results. <br />i <br /> <br />