Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />~ ~'~ <br />Project: Haul Road Y-A Project No.: 95-2384 <br />Location: Hayden, Colorado Report No.: 8 <br />Client: Seneca Coal Company <br />Work Performed: <br />Date: 8/21 /95 <br />Time: 2.0 <br />Mileage: 30 <br />EngrJTech: JK <br />As requested, we visited the project site and conducted nuclear density test No.'s 25 through 27 on the material <br />being placed for subgrade fill. <br />At the time of our visit, the contractor had completed subgrade fill from Sta. 0+00 to Sta. 10+00. Our visit <br />coincided with the operation shift change far this date. <br />Remarks: <br />The material tested generally met project specifications with moisture contents being within 4.3% of optimum. <br />Tests were taken 24+ hours after fill had been placed and compacted in the areas tested. <br />Please refer to the attached sheet for results of today's testing. <br />i <br />Verbal Discussions: <br />Chuck McCulloh of Seneca Coal Co. was notified of today's test results. <br />~~ <br />