My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE104718
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE104718
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:57:52 PM
Creation date
11/24/2007 11:28:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
NH2 1996 Section 3.02.2 Determination of Bond Amount
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• SCRAPER TEAM WORK <br /> <br /> PROIER IDEt117FICATION <br /> Agency or aganimtkm name; OMG <br /> Task # :31 Sare : Gdoratlo PermitlJob H : C-81-008 <br /> Dale.: 0]/20/2000 cnunry: Montrose Abbrevatbn: none <br /> User : HEIR She: New Horizon Filename: 00084-1 <br /> Permit d other Job action : Pr-05 <br /> Task deudptbn: Fid T-Sbz <br /> HOURLY EQUIPMENT COST Shift basis: 2 per day <br /> Equipment Desrdl'Abn <br /> Scraper wodc team -Scraper Car 657E w/WSh-WII <br /> ~PUSh dozer: <br /> Support egWDmem -Load area: <br /> -Dwnp area: Cd[ D9N (1935) Universal <br /> Road maiMenarice'MOmrgrcrder GT 1306 (]995) <br /> -Wa[erQudc:WabsTanker, 10.000 Ga/ <br /> Cost Breakdown: Scraper Work Team Support Equipment Road Maintenance EgWPment <br /> Scraper Dozer load area Dump area Grader WaMr truck <br /> Import data 0lename : svaper2 NA NA dozer giatler mHCtruk <br /> %U8lizatbn-machine: 100 NA NA 33 15 25 <br /> -Ripper attachment: NA NA NA NA NA NA <br /> OwnedBp cost/hwr (56,53 NA NA 522.09 5790 536.43 <br /> Operatlng cost/har: 5178.55 NA NA 526.89 52.88 515.36 <br /> Ripper op. Cost/hour NA NA NA fO.G'0 f0.00 NA <br /> Operator mst/hour 523.69 NA NA f23.2J 523.45 521.70 <br /> Unit wbmaH : 5258.73 NA NA 5]2.19 533.79 573.49 <br /> Number of units : 9 0 0 1 1 1 <br /> Group wbtoals Work: ;1.034.92 SuppoK: ;72.19 Maintenan ce: 5107.23 <br /> Total work team cpst/hoi m: 51,219.39 <br /> MATERIAL QIIANITTIES <br /> Initial Swell Loose <br /> volume: 879,000 CCY (actor: ].IZS voume: 988,875 LCY <br /> Source of quantity akeroR : Eng ert. <br /> Source o(estlmated swell factor: na <br />• HOURLY PRODUCTION <br />Hauling Capatiry <br /> Scraper Payloatl (weight) Basis: Scraper Bowl (wlume) Basis <br /> Material weight 2,.550 pourWs/LCY SWd voume : 32.00 LCY <br /> Matedal desoiptbn : HeapeO volume: 99.00 -LC <br /> Earm-Dry parked Average volume: 38.00 -LCV <br /> Rated paykud: 109.000 pountls Adjusted capadly: 38.00 LCY+:a <br /> Paybatl rapacity :90,78 LCY "' two times adjusted voume on push-pull models <br /> Cycle Tme: Job Conditbn Corrections: Stte altlWtle (ft.) : 5,700 <br /> Scraper Push dozer Source <br /> Scraper badin9 Nme' : I.SO minutes Amlude adj.: 1.000 NA (Cat NB) <br /> Maneuver arM spread time: 0.60 minutes )ob effidency: 0.810 NA (Cat NB) <br /> ' bad fines par pair on push-W II modals Net cpmec(bn: 0.810 NA <br /> Tavel tlme <br /> Rand cgMiBOn tlescnlrtbn : Rutted dirt, little maintenance, no water, 1' Ore penetration <br /> Seg. M Haul dlsance (feet);ra0e (%)8011. res. (%) Tdal res. (%) Vebtlry (fpm) Tavd tlme (mitt.)" <br /> 1 1, 000 -2.80 2.00 -0.80 2992 0.43 <br /> 2 500 -10.00 4.00 fi.00 2879 0.28 <br /> Return raAe : HaW tlme; 0.72 minutes <br /> 1 500 10.00 4.00 19.00 1131 0.98 <br /> 2 1,000 2.80 2.00 4.80 2826 0.95 <br /> aa8~ antl ast segments adjusted for acd+'atbn/deaaxla~atlm Rehm tlme: 0.99 minutes <br /> Total scraper [edm c%de tlme Qoatl + haW + mamwer and spread + return) : 335 minutes <br /> UndtlJustetl unn pmtluctbNhoor : 1,359.)1 LCy/hdtMJuSEei (orJob mditlons : 1,101.36 LCYJhpa <br /> Optlmal number d Sdapers per push tlozer: NA SelxzM number d saapezs: 2 scrapes) <br /> M1usOd1 single scraper team (Iron) hourly productlon : 1, 10136 LCY/hwr <br /> AEJustM naMlple SQdpR team (Ileeq houNy prptluctbn : 2,202.73 LCY/haa <br />• ]OB TIME AND COST <br /> Fleet six: 2 Team(s) Tpal)oG time; 998.93 Hours <br /> unn mst: 50.551 /LCY coal pb cost: fs+s,lss <br />f:1ENGV)ATA\N?\2000PERMR-APPROVED\TABK-ALL.PDF <br />
The URL can be used to link to this page
Your browser does not support the video tag.