My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE104718
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE104718
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:57:52 PM
Creation date
11/24/2007 11:28:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
NH2 1996 Section 3.02.2 Determination of Bond Amount
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimatin0 Software <br />BULLDOZER WORK <br />PRO]ECi IDENTIFICATION <br />Agency or organization name: DMG <br />Task # :29 State :Colorado <br />Date: 01/11/2000 County :Motrose <br />User: HBR Si[e: New Horizon 2 Mine <br />Permit or otherjob action :PROS <br />Task description :DOZER PART OF SLOT CUT BACKFILL <br />• <br />• <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />Initial <br />volume : 300,000 CCY <br />Basic machine :Caf 010N (1996) <br />Blade type: Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :NA <br />Ownership cost/hour : $31.29 <br />Opeating cosVhour : $105.13 <br />Ripper op. cosUhour: 50.00 <br />Operator cosVhour : E23.27 <br />Total unit cosUhour : ;159.68 <br />Swell <br />factor : 1.125 <br />Source of quantity take-off: PIT GEOMETRY <br />Source of est. well factor :SITE INFORMATION <br />HOURLY PRODUCTION <br />Permitrob~ :C81-008 <br />AbbreviaUOn :none <br />Filename:0008-048 <br />Horsepower: 520 <br />Shift basis: 2 per tlay <br />Utilization %COSt data source : CRG <br />NA <br />100 <br />NA <br />NA <br />Total fleet cosUhour :;479.05 <br />Loose <br />volume: <br />337,500 LCY <br />Job Condition Correction Factors <br />Average push distance : 150 feet <br />Unadjusted howdy production : 1175 LCY/hr <br />Material consistency descripton <br />ConsoAtlated stockp/e <br />Avenge push gmdien[ : 10.00 ~.o (negJ <br />Average site altltude : 5,700 fee[ <br />Material weight: 2,550 Ibs/LCY <br />Matedal weight desulDtion <br />Earth - Dry packed <br />JOB T[ME AND COST <br />Fleet size : 3 Dozers) <br />Unit cost: ;0.253 /LCY <br />Ope2tor skill <br />Matedal consistency: <br />Dozing meMod <br />Visibility: <br />Job effidency: <br />Spoil pile: <br />Push gretlien[: <br />Altitude <br />Material weigh[: <br />Blade type <br />Ne[ mrrectlon <br />Adjusted unit DroduNOn <br />Adjusted fleet production <br />Total Job tlme <br />TMaI Job cost <br />0.75 <br />1.00 <br />1.00 <br />1.00 <br />0.81 <br />0.80 <br />1.22 <br />1.00 <br />0.90 <br />1.00 <br />0.54 <br />631.09 <br />1,893.13 <br />178.28 <br />585,404 <br />Source <br />(av9') <br />(Cat HB) <br />(Den.) <br />(av9J <br />(2shiR5May) <br />(tnWo <br />(Caf HB) <br />(Cef HB) <br />(Caf HB) <br />(S or U) <br />LCV/hr <br />LGY/hr <br />Hours <br />F:1ENG\DATA\W P\2000PERMR-APPROVED\TASK-ALL. PDF <br />
The URL can be used to link to this page
Your browser does not support the video tag.