My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE104718
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE104718
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:57:52 PM
Creation date
11/24/2007 11:28:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
NH2 1996 Section 3.02.2 Determination of Bond Amount
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ROADABLE EQUIPMENT: <br />------------ <br /> Machine Description <br /> Drill RIg <br /> 5,000 Galbn Water Truck <br /> Fuel Tmrk <br /> Wbe Truck <br /> Pickup Truck <br /> M08/DEMOB SUPPORT EQUIPMENT: <br /> .................... ... <br />Non-ROadable Eqp. Description <br /> sneer z a z <br />Taal Eqp. Fleet Size Haul Trip Retum Trip <br />Cost/hr (no. hauled) Cost/hr Cost/hr <br />$125.00 1 5125.00 1125.00 <br />5-81.93 1 581.93 &81.93 <br />598,08 1 596.08 596.08 <br />552.91 1 157.91 557.91 <br />$39.10 1 $39.10 539.10 <br /> Sublotah: 5349.52 $399.52 <br />Wegh[ Ownership Haul Rig Fleet Sae Haul Trip Realm Tdp DOT Pertnl[ <br />(tons) Cosryhr Cost/hr (rro. hauled) Cost/hr CosT/hr Cost/ea <br /> Subtotals : &0.00 50.00 >;0.00 <br /> Taal Fpp. Fleet Size Haul Tdp Retum Trip <br />Roatlable Eqp. Description Cosryhr (no. hauled) Cmt/hr Cost/hr <br />Grove RTSBD Hydrzulk Crane 571.96 1 371.96 57L96 <br /> Subtotals : 3]1.96 571.96 <br />EQUIPMENT HAUL DISTANCE & TIME <br />Nearest major cRY or [own wlNin project area regbn: Gmnd JuncYbn <br />Total one way travel disbnce = 115.0 miles. Average bavN speed = 90.00 mph <br />Job Time -Non Roadable Equip.= 0.50 hours batl Roatlahle Equip = N/A hours batl <br /> 2.88 hours haul 2.88 hours haul <br /> 0.50 hours unload N/A hours unload <br /> 2.88 hours re[um 2.88 hours realm <br />JOB COST Total Hob/Demob Cost = 526,047.]1 <br />NOTE: Non-roatlable equipment (haul rig required [q tansport) mob/demob costs based on 2 round trips, each trip consisting of a one-Way loaded haul and aone-Way empty <br />re[um. Roadable equipment (no haul rig required) costs based on one routs trip. Colorado DOT requires spetial permits for oversize equipment on mrtain spedfled road <br />segments within the State. Separate permits are required for each ry on each traded tnp. PdditlanalN, pilot cars (one or two per rig tlepeMilg on degree a oversize) are <br />alw required for oversize equipment hauling, aM loadirg/unloadirg times must be irgeased wbstantlalN for equipment which must be partlaN dismantled (or t2nsport <br />and re-assembled at the jab site. Costs for lifting equipment aM o81er wpport equlpment rleetletl fw thls Cork should ce etduded nt the rtiob/demob ms[s. <br />II , <br />u <br />FiENG\DATA\WP12000PERMIT-APPROVEDITASK-ALL.PDF <br />
The URL can be used to link to this page
Your browser does not support the video tag.