Laserfiche WebLink
Western Fuels-Colorado <br />Reclamation Cost Summary Form <br />TASK#: 15 ROSS L. GUBKA, P.E. <br />Date: January 26, 2000 OPERATION: NEW HORIZON MINE #2 <br />PERMIT#: C-81-008 <br />Task Description: Replace Topsoil on Facilities Area page 1/2 <br />HOURLY EQUIPMENT COST Basic Machine: Caterpiller D9R <br />Equipment: 4 -Caterpillar 637E Push-Pull Scapers Shifts: 1/day <br />Utilization: 100% <br />Ownership cost/hr: $70.46 <br />Operating cosUhr: $132.02 <br />Opeator cosUhr: $23.13 <br />sub-total $225.61 <br />Scraper Team cost/hr $902.44 <br />Equipment: 1 -Caterpillar 14G Grader <br />Utilization: 50% <br />Ownership cost/hr: $38.74 <br />Operating cosUhr: $18.16 <br />Opeator cosUhr: $23.13 <br />sub-total $80.03 <br />Equipment: 1-5000 gallon water truck <br />Utilization: 50% <br />Ownership cosUhr: $24.11 <br />Operating cost/hr: $18.27 <br />Opeator cosUhr: $20.78 <br />b-total $63.16 <br />~otal Work Team cost/hr: $1,045.63 <br />Material Quantities: <br />Volume: 67,300 <br />Swell 1 <br />Loose Volume: 67,300 <br />HOURLY PRODUCTION <br />Scraper Cycle Time <br />Load (Minutes) 1 <br />Maneuver & Spread (Minutes)= 0.6 <br />Job Condition Correction Factors <br />Site Altitude+ (ft) 5700 <br />Alt. adjustment 0.97 <br />Job efficiency 0.83 <br />Net Correction 0.8051 <br />HAUL ROUTE <br />road Seg. # 1 <br />length (ft) 1000 <br />~ade res (%) 3 <br />Iling res (%) 3 <br />Total Resistance (%) 6 <br />F:\ENG\DATA\WP\2000PERMIT-APPROVED\BON DB. QPW <br />