My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE104718
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE104718
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:57:52 PM
Creation date
11/24/2007 11:28:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
NH2 1996 Section 3.02.2 Determination of Bond Amount
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Western Fuels-Colorado <br />Reclamation Cost Summary Form <br />TASK#: 13 PREP. BY: ROSS L. GUBKA, P.E. <br />Date: January 26, 2000 <br />Task Description: Remove Pond 009 <br />HOURLY EQUIPMENT COST Basic Machine: Caterpiller D9R <br />Slade type: Semi-Universal <br />Attachment #1: ROPS Cab <br />Attachment #2: 1-shank ripper <br />Cost/Hr Breakdown <br />MATERIALQUANTITIES <br />Initial Volume: <br />Swell Factor <br />Loose Volume (LCY) <br />Source of quantity take-off <br />HOURLY PRODUCTION: <br />OPERATION: NEW HORIZON MINE #2 <br />PERMIT #: C-81-008 <br />owners hip :...................................................................... <br />material 8 supplies plus repairs :.................................... <br />ooerator :..................................................................... <br />Total equipment cost per hour <br />Contractors contingencies <br />Net equipment cost per hour <br />19,500 <br />1 <br />19, 500 <br />3.02.2 <br />~erage Push distance (feet) 200 <br />Unadjusted hourly dozer production (IcyrHR 701 <br />Avg Push gradiant 0% <br />Avg site altitude (ft) 5,70D <br />Material weight Ibs/LCY 2,900 <br />Decomposed rock - 50%Rock, 50% Earth <br />Adjusted Unit Prod. (LCY/HR) 279 <br />Shifts: 1/day <br />$ i 6.36 <br />$37.18 <br />48 <br />$79.01 <br />125% <br />$98.76 <br />Job Condition Corection Factor <br />Operator 0.75 <br />Mat consistency 0.90 <br />Dozing method 1.00 <br />visibility 1.00 <br />Job efficiency 0.83 <br />Spoil Pile faGOr 0.90 <br />Push gradient 1.00 <br />Altitude denting 1.00 <br />Material Weight 0.79 <br />Blade Type 1.00 <br />Net Job correctio 0.40 <br />JOB COST: <br />Fleet Size 1 <br />Total Job Time (Hr): 69.83 <br />Unit cost ($/LCY) $0.3537 <br />Total Job Cost <br /> <br />$6,897 <br />F:\ENG\DATA\WP12000PERMIT-APPROVED\BONDB.QPW <br />
The URL can be used to link to this page
Your browser does not support the video tag.