Laserfiche WebLink
Western Fuels-Colorado <br />Reclamation Cost Summary Form <br />TASK #: 4 <br />ROSS L. GUBKA, P.E. <br />Date: January 26, 2000 OPERATION: NEW HORIZON MINE #2 <br />PERMIT#: C-81-008 <br />ask Description: Remove surface Material from Facilities area and Haul to P page 1/2 <br />HOURLY EQUIPMENT COST <br />Equipment: <br />Utilization: <br />Ownership cosUhr: <br />Operating cost/hr: <br />Opeator cosUhr: <br />sub-total <br />Scraper Team cosUhr <br />Basic Machine: Caterpiller D9R <br />4 -Caterpillar 637E Push-Pull Scapers <br />100% <br />$70.46 <br />$132.02 <br />$23.13 <br />$225.61 <br />$902.44 <br />Shifts: 1/day <br />Equipment: <br />Utilization: <br />Ownership cosUhr: <br />Operating cosUhr: <br />Opeator cosUhr: <br />sub-total <br />Equipment: <br />Utilization: <br />Ownership cosUhr: <br />Operating cost/hr: <br />Opeator cosUhr: <br />sub-total <br />~tal Work Team costlhr: <br />Material Quantities: <br />Volume: <br />Swell <br />Loose Volume: <br />HOURLY PRODUCTION <br />Scraper Cycle Time <br />1 -Caterpillar 14G Grader <br />50% <br />$38.74 <br />$18.16 <br />$23.13 <br />$80.03 <br />1-5000 gallon water truck <br />50% <br />$24.11 <br />$18.27 <br />$20.78 <br />$63.16 <br />$1,045.63 <br />28,700 <br />1 <br />28,700 <br />Load (Minutes) i <br />Maneuver & Spread (Minutes)= 0.6 <br />Job Condition Correction Factors <br />Site Altitude+ (ft) 5700 <br />Alt. adjustment 0.97 <br />Job efficiency 0.83 <br />Net Correction 0.8051 <br />HAUL ROUTE <br />road Seg. # 1 <br />length (ft) 3800 <br />Grade res (%) 1.3 <br />~Iling res (%) 3 <br />otal Resistance (%) 4.3 <br />F:\ENG\DATA\WP\2000PE RMIT-APPROVED\BON DB.QPW <br />