My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE104718
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE104718
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:57:52 PM
Creation date
11/24/2007 11:28:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
NH2 1996 Section 3.02.2 Determination of Bond Amount
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />CIRCES Cost Estimating SoRware <br />TRUCKILOADER TEAM WORK <br />Sheet 1 of 2 <br />PROJECT IDENTIFICATION <br />Agency or organization name : DMG <br />Task # : 001 State: Colorado Permifrob # : C•81.008 <br />Date ; 01/20/2000 County ;Montrose Abbreviation :none <br />User: HBR Site :New Horizon Filename: 0008-001 <br />Permit or other job action : PR-05 <br />Task description: Haul OB pile to open oit <br />HOURLY EQUIPMENT COST Shift basis: 2 per day <br />Equipment Description <br />• <br />Truck loader Team Truck : Cat 7738 (1996) <br />Loader; CAT 9920 High Litt (1997) <br />Support equipment -Load area: NA <br />Dump area: NA <br />Road maintenance Motor grader: CAT 1306 (1995) <br />-Water truck: Water Tanker, 10,000 Gal. <br />Cost Breakdown ; Truck/Loader Work Team Support Equipment Road Maintena nce Equipment <br />Truck Loading Tool Load Area Dump Area Motor Grader Water Truck <br />Import data filename: truck2 loader NA NA grader misctruk <br />Utilization-machine: 100 96 NA NA 20 25 <br />Ripper attachment: NA NA NA NA NA NA <br />Ownership cost/hour; $34.38 $58.08 NA NA $7.40 $36.43 <br />Operating cosUhour; $68.02 $98,18 NA NA $3.84 $15.36 . <br />Ripper op, cosUhour: NA NA NA NA $0.00 NA <br />Operator cos/hour; $22,56 $23,45 NA NA $23.45 $21,70 <br />Unit subtotals ; $124.96 $179,71 NA NA $34.70 $73.49 <br />Number of units ; 3 1 0 0 1 1 <br />Group subtotals: Work; $554 ,58 Support: $0,00 Maintenance:$108.19 <br /> Total work team cosUhour : $662.77 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume ; 318,400 CCY factor: 1.165 volume :310,936 LCY <br />Source of quantity takeoff ; M1. Nucla <br />Source of estimated swell factor. na <br />Material purchase cost ; $0.00 /LCY Total cost: $0 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis ; Truck Bed (volume) Basis <br />Material weight ; 2,900 pounds/LCY Struck volume 34.00 LOY <br />Descr.: Decomposed rock - 50% rock, 50% earth Heaped volume: 44.60 LOY <br />Rated payload: 117,140 pounds Average volume: _ 39,30 LOY <br />Payload capacity: 40,39 LCY Adjusted capacity ; 39.30 LOY <br />Final adjusted truck capacity based on specific number of loader passes ; 41,25 LOY <br />• Loading Tool Capacity ; Job Condition Corrections: Site altitude ((t.) ; 5,700 <br />Rated capacity (nom, heaped) :12.500 LCY Truck Loader Source <br />Descr. ;Blasted rock -avg. blasted (75- 90%) Altitude adj. ; 1.000 1, 000 (Cat HB) <br />Bucket fill factor ; 0.825 Job efficiency: 0.810 0.810 (2 shifts/day) <br />Adjusted bucket capacity: 10,312 LCY Net correction ; 0.810 0.810 <br />F:\ENGIDATAI WP12000PE RMIT-APPROVED\TASK-ALL. PDF <br />
The URL can be used to link to this page
Your browser does not support the video tag.