Laserfiche WebLink
Sanborn Creek Subsidence Page 47 September 2, 1997 <br />REFERENCES (Continued) <br />• Ochab, Z„ 1961, Rules concerning new instructions for the <br />determination of safety pillars in the collieries of Upper <br />Silesian coal fields: Polish Ministry for Mining and Power, <br />Report No. 271 <br />Pendleton, J.A., 1985, Coal mine subsidence in Colorado, Practical <br />application in a regulatory setting: SME Preprint No 85-328, 8 <br />P <br />Peperakis, J., 1968, Multiple seam mining with longwall: Min Conq <br />Jour, p 27-29, Jan <br />Piggott, R.J. 6 P. Eynon, 1977, Ground movements from the presence <br />of abandoned mine workings: Proc Conf on Large Ground Movements <br />and Structures, ed J.D. Geddes, J Wiley, p 749-780 <br />Smith, W.C., 1993, Roof control strategies for underground coal <br />mines: USBM Info Circ 9351, 17 p <br />Steeple, D.T., 1956, A study of problems encountered in multiple <br />seam mining in the eastern United States: Virginia Polytechnic <br />• Inst, Engrg Exp Station Series No. 107, v XLIX, n 5, 64 p <br />• U.S. Government, 1991, Code of federal regulations, Title 30, <br />Mineral Resources: U.S. Govt Printing Office, 761 p <br />Voight, B. ~ W. Pariseau, 1970, State of the predictive art in <br />subsidence: Proc. ASCE v. 96, SM2, p. 721-750. <br />Wardell, K. ~ Partners, 1976, Guidelines for mining under surface <br />water: Dept of Commerce NTIS PB-269 729, 59 p <br />Wilson, R.H., 1972, Research into the determination of pillar size, <br />Part 1, An hypothesis concerning pillar stability: The Mining <br />-~ Engineer, Trans, Inst. Mining Engineers, p 909417, Jun <br />Zachar, F.R., 1952, Some effects of Sewickley seam mining on later <br />~-- Pittsburgh seam mining: Mining Engrg, p 687-692, July <br />i <br />L <br />i~ <br />97 <br />