Laserfiche WebLink
CIRCES Cost Estimating Software <br />Task # : 001 <br />Date : 06/11/2004 <br />User : GRS <br />State :Colorado PermiUjob# : M-2004-036 <br />County :Washington Abbreviation :none <br />Site :King Pit Filename :M036-001 <br />Agency or organization name : CO. DMG <br />Permit or otherjob action :NewAppli <br />Task description :Spread <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D7R Series 11 - 7SU Horsepower : 240 <br />Blade type :Semi-Universal <br />Attachment no. 1 ;BOPS Gab Shift basis : 1 perday <br />Attachment no. 2 ;3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : 540.38 NA <br />OperatingcosUhour: $43.70 100 <br />Ripper op. cosUhour : $2.90 50 <br />Operator cosUhour: $24.01 NA <br />Total unit cosUhour : $110.98 Total fleet cost/hour : x110.98 <br />s< <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 8,000 LCY factor: NA volume: 8,000 LCY <br /> <br />Source of estimated volume :Appl. <br />Source of estimated swell factor :NA <br /> <br />HOURLY PRODUCTION Job Condition Correcticn Factors `Source <br />Average push distance : 120 feet <br />Unadjusted hourly production : 622.9 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient <br />Average site attitude <br />Material weight <br />Weight description <br />EaRh -Dry packed <br />10.00 % (i <br />4,000 feet <br />2,550 ibs/LCY <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.324 /LCY <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.22 <br />Altitude : 1.00 <br />Matedal weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.55 <br />Adjusted unii production : 342.75 LCYIhr <br />Adjusted Fleet production : 342.75 LCYlhr <br />Total job time : 23.34 Hours <br />Total job cost : x2,590 <br />