Laserfiche WebLink
• <br />RECLAMATION COST SUMIART cont'd sheet 4 of <br />K. PORTAL/SHAFT SEAL IMG <br />Tesk Mo.l Tesk Description I Coet (f) <br />_I _._~_______________.._~.__~_I_.___~.._ <br />I I <br />I I <br />I I <br />I I <br />Subtotal (K): <br />L. DRILL HOLE/NONITORI MG HELL SEALING <br />Tesk Mo.l Task Description <br />_~__ I ~_~______~_"'__.•__'-__________ <br />I <br />I <br />I <br />I <br />I Cost (s) <br />Subtotal (L): <br />M. MISCELLANEOUS RELLAIVITION TASKS <br />Tesk Mo.l Task Description I Cost (f) <br />_______I________________________________________________I ___ <br />6 I Hopper Rein I (1,666 <br />I Demolition I <br />4 I Seeding I f34,687 <br />I Forcing I <br />5 I Mab/Denob I f1,998 <br />Subtotal (M): f38, 351 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): f75,791 <br />Il. IMD IRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Itch Mo.l Item Description I Lost (S) <br />__~__ I _~____________________________________________ I ____________ <br />1. I Public Liability Insurance.... t.550X of dir. I 5),175 <br />2. I Contractor's Performarce Bard 0.975% of dir. I fT39 <br />3. I Contractor's Profit........... 10.00% of dir. I 57,579 <br />4. I Jab SuperinteMent.. I <br />Subtotal (A): f9, 491 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): f85, 283 <br />B. DNG PROJECT ADMINISTRATION EXPENSES <br />I tewt Mo.l Item Description I Cost (f) <br />I I <br />1. I Minerals Program Adm 5.00X of cntr.l (4,264 <br />MET INDIRECT ODST PERCENTAGE: 18. 15X Subtotal (B): <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): <br />TOTAL PERFORMANCE BOND AMOUNT (di ract plus indirect costs): (89,548 <br />f4,264 <br />---_513,757 <br />