Laserfiche WebLink
<br />NOURLY (PRODUCTION: <br />Screpellr Cycle Tine <br />---"_r-"'--~_ <br />Load = 1 ^in. <br />Manvrver i spread = 0.6 ^i n. <br />T revel) time (haul i return): <br />Raul ~e <br /> <br />Job Condition Correctim Factors <br />~ Site altitude 5000 ft. <br />Alt. adjustment .. 1 <br />Job efficiency ... 0.83 (7s <br />Net Correction 0.83 <br />Road Length Grade Rolling Total Velocity Travel times <br />seg.) (f t) res.(X) res.(X) res.(X) (fpm) (min) <br />____1________-____- ___ - __ ___ <br />t 7000 -2.00 2.00 0.00 2640 0.56 <br />I <br />Raul time = 0.56 min. <br />Return route ------------ <br />' t 1000 2.00 2.00 4.00 2933 0.55 <br /> <br />•1st i fast cep. adj. for accel./decal. Return time = 0.55 min. <br /> <br />Total Cycle Time = 2.77 min. <br /> <br />-Y + Machine Volume <br />Machine Payl Dell <br />~ - --- <br /> Struck capacity = 21.00 <br />Maters l weight = 2300.00 lbs/LCT ~ Heaped capacity = 31.00 <br />Met. stri~tim ------ ~ ----------- <br />GENERAy FILL ~ Average = <br />Retell {}eYload....= 75,000YIbs.~ ~ Adjusted volume = <br />Peyl oec~ volume...= 32.61 LCY <br />Unedj usted production per scraper <br />~ or push-pull pair <br />IILSted Production .................................: <br />Ad1 <br />Adj~+sted hourly fleet production ....................: <br />JOB [OST:~ <br />I <br />Fleet sire 2 Scraper(s) <br />Total Jab Time: <br />Unit Coat 50.459 /LCY ~ Total Job Cost: <br />26.00 LCY <br />26.00 LCY <br />575.46 LCT/hr <br />477.63 LCY/hr <br />955.26 LCY/hr <br />3.80 Nours <br />57,666 <br />