My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE104586
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE104586
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:57:46 PM
Creation date
11/24/2007 11:19:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995060
IBM Index Class Name
Permit File
Doc Date
2/16/2001
Doc Name
BUTCHER PIT PN M-1995-060 ENCLOSED BOND RECALCULATION
From
DMG
To
SOUTHWAY CONSTRUCTION CO INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s • <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br /> Agency or organization name . DMG <br /> <br />Task # : Ola Stale . Coloratlo PermiUjoD# : M-1995060 <br />Dale : 02/152001 County : Alamosa Ahbreviation :none <br />User. SSS Sde:BUrcher Prr Filename: MO60-Ofa <br /> <br />Permi t or other job action : Routine Bond Recalcu/ariorl <br /> <br /> Task description : Cu[ and till highwall reduction <br /> <br />HOURLY EQ UIPMENT COST Basic machine :Cat D7H Series 2 (1996) Horsepower : 215 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : RCPS Cab Shift hosts : 1 per day <br /> Attachment no. 2 :3-shank ripper <br /> Utilization % Cost data source . (CRG) <br /> Cost Breakdown : Ownership cosUhour : 838.31 NA <br /> Operating cosUhour : 848.69 100 <br />Ripper op. cosVhour: 41.22 <br />Operator cosgheur: 827.99 <br />Total unit cosUhour : 4116.21 <br />20 <br />NA <br />Total fleet cosUhour: §116.21 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume' 7,172 LLY factor: NA volume: 7,172 LCY <br />Source of quantity take-oft :Assume 6160' pit perimeter w/f0' higllwall retluced fo 4:1 <br />Source of est. swell factor : NA <br />HOURLY PRODUCTION <br />Joh Condition Correction Factors <br />Average push distance: 63 feel Source <br />Unadjusted hourly production: 823 LCY/hr <br />Material consistency description <br />Compacted 011 or emhankmenf <br />Average push gradient: 12.60 %/ncg/ <br />Average site altitude : 7,660 feel <br />Material weight : 2,400 Ibs/LCY <br />Material weight description <br />Sand -Dry. loose <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Operator skill : 0.76 (avg <br />Material consistency : 0.90 (Cat h <br />Dozing method : 1.00 (gen <br />Visihtlily: 1.00 (avg <br />Job ef6cienty: 0.83 (1shiN~ <br />Spoil pile: O.BO (Ind- <br />Push gradient : 1.28 (Cat I <br />Altitude: 0.93 (Carl <br />Material weight : 0.96 (Car I <br />Blade type : 1.00 (S or <br />Net correction : 0.61 <br />Adjusted unit production : 420.01 LCY/hr <br />Adjusted heel production : 420.01 LCY/hr <br />Unit cost : 80.277 /LCY <br />Total lob lime . 17.08 Hours <br />Total lob cost : 81,984 <br />
The URL can be used to link to this page
Your browser does not support the video tag.