Laserfiche WebLink
-3- <br />determined: <br />b) The Board will enter the lands to perform reclamation only if the Board has <br />i. that reclamation required by law to have been pafornted upon such lands has <br />not been pertbnned, and <br />ii. that perms[ revocation proccedings described in the Act or similar provisions <br />of subsequent laws, if any, have been initiated <br />c) The Division, acting for the Board, will enter lands [o respond [o an emergency oNy <br />where the Division determines that any of the conditions of Construction Ma[eria] Rule 8.4.2 exist. <br />7) The addition:il conditions sei forth in the attached rider, if any, are inwrporated herein by <br />reference. <br />/_/ a) Rider is attached. <br />/ XX / b) No rider is attached <br />MINED LAND RECLAMATION BOARD <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />\~ <br />D 1~AEL B. <br />Division Director <br />