Laserfiche WebLink
Section 780.21(b} Continued. <br />Hydrology; and Map 17a, Kerr Tipple Area Hydrology. The monitoring <br />schedule and parameters lists are shown on Table 61, Kerr Mine Area <br />Hydrologic Monitoring Schedule. <br /> <br />780-107bbbR Revised - January, 1991 ' <br />