Laserfiche WebLink
loader and used as a product common to the asphalt paving <br /> or roadbase. As the depth of weathering decreases a crusher <br /> ' will be located on the site for the crushing and screening of <br /> the materials. <br /> ' Topsoil and overburden removal will be removed and stock- <br /> pile in a berm around the crusher equipment. Recl amotion <br /> will be a continuous process after an area is excavated to <br /> the finished grade. <br /> Since one hundred percent of the excavated material can be <br /> ' used, there will be no backfilling in the excavated area. No <br /> ' geologic hazards presently exist nor will there be any created <br /> by the proposed mining operation. After the mining operation <br /> 1 is completed, all equipment will be removed and new land <br /> ' development activities will begin with a commercial develop- <br /> ment. <br /> tIn summary the mining operation will be accomplished over a <br /> ' five year period with concurrent reclamation. The volume of <br /> excavotatable material was calculated to be 600,000 cubic <br /> yards. The excavated area will be developed into a commercial <br /> ' area with uses as stores for retail trade, service establishment, <br /> restaurants or other such similar commercial uses. <br /> I <br />