Laserfiche WebLink
:., <br />-2- <br />EXHIBIT E -Map (Rule 6.3.51: (I) In addition to the requirements of G.2. I (2), you must Itrovide a map that clearly. <br />describes the features associated with the mining plan and the components of the Reclamation Plan. include one map for <br />the mine plan and one map for the Reclamation Plan. The map(s) must be drawn to a scale no smaller than appropriate <br />to clearly show all elements [hat are required to be delineated by the Act and these Rules: show a north artow, note am <br />section comers adjacent to the proposed operation, and indicate the date illustrated. At a minimum, maps must include <br />the following information: <br />(2) Mining Plan Mao <br />(a) outline and label the permit boundaries, described in Exhibit A -Legal Description; for all Limited Impact <br />110 and Special l l 1 Operations, the OfTice considers the area bounded by' the permit boundary to be analogous to the <br />affected azea; <br />(b) label the names of owner(s) of rewrd of the surface of the affected area, of the land within hvo hundred <br />(200) feet of the affected area, identify the owner of the substance to be mined, and the type of structure and owners of <br />record of any permanent or man-made structures within 200 feet of the affected area; <br />(c) outline and label all major surface features to be used in connection with the proposed operation such <br />as: existing and proposed roads, pit boundary, topsoil stockpiles, overbtuden stockpiles, product stockpiles. waste rock <br />fills, stream channels, buildings, processing plant, underground openings such as adits or ventilation facilities, ponds, <br />impoundments, dewatering pumps, diversions, tailor waste disposal areas; <br />(d) indicate the direction that mineral extraction will proceed: <br />(e) note the location of any significant, valuable, and permanent man-made structures.within hvo hundred <br />(200) feet of the affected area such as houses, bane, fences, above or below ground utilities, irrigation ditches. maintained <br />or public roads, bridges, wells, pipelines, water storage impoundments, railroad tracks, cemeteries, and communication <br />antennas. A narrative description must be provided in Exhibit B -Site Description; and <br />(t) outline and label existing disturbance within and/or adjacent to the permit boundary (e.g., previously <br />mined areas, roads or excavations resulting from utility conswction). Re-disturbance of previous)} disturbed areas, by <br />the proposed mining operation, must be included in the pemtit azea and addressed in Exhibit. D -Reclamation Plan. <br />(3) Reclamation Plan Mao <br />(a) show the gradient of all reclaimed slopes (horizontal vertical) sufficient to describe the post mine <br />topography; <br />(b) indicate where vegetation wit! ~C be established and the general area(s) For shrub or tree planting: <br />(c) if ponds ate a part of the Reclamation Plan, outline the fmal shore configuration of the ponds and shallow <br />areas if the future land use is for wildlife: <br />(d) state the average thickness of replaced overburden by reclamation area or phase: and <br />(e) state the average thickness of replaced topsoil by reclamation area or phase. <br />