My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE104364
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE104364
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:57:37 PM
Creation date
11/24/2007 11:05:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000158
IBM Index Class Name
Permit File
Doc Date
8/10/2001
Doc Name
S&H MINE M-2000-158 PERMIT ISSUANCE-CONSTRUCTION MATERIAL OPERATION
From
DMG
To
PLATTE SAND & GRAVEL LLC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RIDER TO MINING PERMIT <br />Penns Date: August 10, 2001 <br />Pemtit No: M-2000-158 <br /> <br />The following additional stipulations and conditions form an integral part of the fon;going permit: <br />Stipulation No. Description <br />The Applicant will install recharge swctures between the point of dewatering and any wells <br />adjacent to the operation. Sufficient waters being discharged will be directed to the recharge <br />structures to protect adjacent wells and the cottonwoods while alive dewatering is occurring. <br />The Appbcarrt will prepare and submit to the Division for its approval a complete design for <br />the construction of any recharge structure by no later than August 1, 2001. By private <br />agreenent, the Applicant has agreed to submit the design for the recharge structures to Dr. <br />Ptasnik and his consultants for their approval. The Apphcarrt and Dr. Ptasrrik intend to agree <br />on the canstnrction designs for the recharge stnrctures prior to submittal to the Division. <br />The Apphcarrt will nd conduct any dewatermg activities urtil the design for the recharge <br />stnrduns is approved by the Division and incorporated into the permit. Further, dewateritrg <br />will not be conducted until the recharge structures are carrstrrrcted. <br />MINED LAND RECLAMATION BOARD <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />C LB.L <br />Division Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.