Laserfiche WebLink
Blue Mountain Energy, Inc. <br />Permit No. 12R6802-5 <br />Final Approval Colorado Department of Public Health and Environment <br />page 2 Air Pollution Control Division <br />4. This source shall be limited to a maximum production rate as listed below and all other activities, <br />operational rates and numbers of equipment as stated in the application. Monthly records of the <br />actual production rate shall be maintained by the applicant and made available to the Division for <br />inspection upon request. (Reference: Regulation 3, Part B, III.A.4) <br />Production/Processing of coal shall not exceed 25,000 tons per day or 2,600,000 tons per year. <br />Compliance with the yeady production limits shall be determined on a rolling twelve (12) month <br />total. <br />5. All conveyors shall have conveyor covers and transfer points shall be fully enclosed. <br />6. A Revised Air Pollutant Emission Notice (APEN) shall be filed: (Reference: Reg. 3, Part A,II.C) <br />a. Annually whenever a significant increase in emissions occurs as follows: <br />For any criteria pollutant: <br />For sources emitting less than 100 tons per year, a change in actual emissions of five <br />tons per year or more, above the level reported on the last APEN submitted; or <br />For sources emitting 100 tons per year or more, a change in actual emissions of five <br />percent or 50 tons per year or more, whichever is less, above the level reported on the <br />last APEN submitted; or <br />For any non-criteria reportable pollutant: <br />If the emissions increase by 50°/a or five (5) tons per year, whichever is less, above the <br />level reported on the last APEN submitted to the Division. <br />b. Whenever there is a change in the owner or operator of any facility, process, or activity; or <br />c. Whenever new control equipment is installed, or whenever a different type of control <br />equipment replaces an existing type of control equipment; or <br />d. Whenever a permit limitation must be modified; o r <br />e. No later than 30 days before the existing APEN expires. <br />All previous versions of this permit are canceled upon issuance of this permit. <br /> <br />R K Hancock III fQolahd C. Hea, P.E." " <br />Permit Reviewer Unit Leader <br />Issued: InRial Approval iacued Jute 30, 1981 <br />Initial Approval motlification #t issuetl NovemEer 29, 1992 <br />Final Approval end motlifiwtion #2 (Name ChanOe) issued April 75, 1998 <br />Final Ayprovel modRraton 1p issued May 23, 2001 <br />Motlifwation #1: Increase in protluction from 1,350,000 t#m/year to i 600,000 tonayaer <br />MotlMication #2 (Name Change): Name Mange to Blue Mountain Energy, Ina <br />Modification #3: Ixraasmg throughputs from 67001ava per day end 1,600,000 tons per year. <br />Motlincetion 6`4: Ir,aeasing Nioughput limas hom 20,000 tom per day entl 2,400,000 tons per year <br />Notes to Permit Holder: <br />103/0014/005 var. 2/00 <br /> <br />