My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE104211
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE104211
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:57:31 PM
Creation date
11/24/2007 10:54:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 17 VENTILATION SYSTEM AND METHANE DUST CONTROL PLANS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
outby the faces of developing entries. Whenever the <br />_ third connecting crosscut is broken through, work <br />• shall be started on building the third outby stop- <br />ping as soon as possible and shall continue in a <br /> reasonable and diligent manner until completed. <br /> Similarly, whenever a belt line is advanced, tempo- <br /> rary stoppings (brattice), shall be installed immed- <br /> iately and work shall be started on building the <br /> permanent stoppings as soon as possible and shall be <br /> continued in a reasonable and diligent manner until <br /> completed. <br />c. Permanent stoppings between intake and return air' <br /> courses shall be erected and maintained to'within <br /> 600' of the working face of developing rooms. This. <br /> distance shall be measured between the working face. <br /> and the centerline of the first "open" outby cross- <br /> cut between the intake and return air courses. <br />d. permanent stoppings separating intake, return and' <br /> belt entries may be removed temporarily for special <br /> construction or repair projects such as; belt or <br /> belt drive repair or replacement, undercast or over- <br /> cast construction, back entry maintenance, etc. <br /> Temporary stoppings (brattice) shall be installed <br /> immediately and maintained until the project is - <br /> completed. <br /> Permanent stoppings shall be reconstructed immedi- <br /> ately after the project is completed. <br /> <br />• 2a. Typical drawings Eor each type of ventilation con- .`:~i~ j#*~; <br /> trol devices used in the mine are shown on Pages 8 ', :'~;:~, <br /> through 13. ,....` <br />~''~ ~ <br />b. On Pa a 14 is a list- of MSHA acre ted or a <br /> sealants. ;`.;; :; <br />c. On Pages 17 and 18 are typical drawings for each <br /> type of permanent seal. <br />• <br />h.i ~~ ~• 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.