Laserfiche WebLink
Reclamation Scheduling <br />Action Taken <br />Bonds procured <br />Time Period <br />Prior to mine disturbance <br />Sediment Control <br />Topsoil removed and stored <br />Prior to mine disturbance <br />Prior to mining excavation <br />Rough grading Prior to creating 4 spoil ridges or less than <br />180 days unless approved by variance (see Exhibit <br />19-11 <br />Final grading (Phase I bond release <br />is ready for implementation) <br />Per schedule shown on Exhibit 19-1 <br />Spoil sampling <br />Areas which are severely compacted <br />will be ripped on the contour, and <br />topsoil replaced from stockpiles <br />or direct hauled <br />Area is drill seeded with the <br />appropriate perennial seed mix, <br />is seeded, shrubs or trees are <br />planted as spring or fall <br />dormant plantings (Phase II bond <br />release is ready for implementationl~ <br />A small grain cover crop is applied <br />at a rate of 20 (drilled) or 40 <br />(broadcast)Ibs/acre <br />After final grading is completed and prior to <br />soil replacement in areas shown on Exhibit 6-6 <br />Within one year after final grading is <br />completed, provided the area is not required <br />for facilities as described in the Projected <br />Backtilling and Grading Schedule section <br />First appropriate planting season <br />after topsoil is replaced <br />6 <br />Revised 10/07!93 <br />