Laserfiche WebLink
Well. :•1- } , cw-s-4 z <br />?5' <br />~0' <br />'S <br />~51'_ <br />,_ <br />?~I'- <br />831'- <br />Well Consiruc- <br />tion Log General Geo- <br />logic Log <br /> <br /> Soils <br /> <br />176' c <br />solid <br />pvc 4" Shale <br /> sandstone <br /> Lennox Coal <br /> <br />P1 <br />wi <br />stic P <br />h ceme <br />cker <br />t Sandstone <br /> <br /> <br />7 <br />well s <br />reen Wedge <br />Coal <br /> <br />2" <br />C solid <br />ement pipe. Sands [one <br />and Shale <br /> T.D. <br />194.0' <br />WELL CONSTRUCTION ~UA/IMARY • <br />Loc. of coor. Elev. ground level 7~i>~ 1H <br />ann65 6ss. 1a757 17F top of casing <br />Personnel J.E. Co croft project <br />fOtol depth 185.0' Rig Rotary (Mayhew 1000) <br />3orehole diometer 5.25" BIt6 4 7/8' diamond core bit <br />Driller Joe Arguello Drillers fluid water <br />Casing date/time-Start 7-29-s1 Finish 8-2-a1 <br />Geophysical loggtnq-Open holecc,c,v, Closed hole cc <br />C,R,SP. <br />Casing Solid 4" pvc casing was placed to 176.0' (into <br />the wedge coal seam). Solid pvc was also placed <br />between 183' and 185'. <br />Screen or slots 7' of 4" well screen wa.s placed into • <br />the wadge coal seam between 176' and 183'. <br />Cement and packers Cement was placed at the bottom of the <br />hole to seal of the wadge under underburden. Cement <br />was also placed above a plastic packer @ approximate <br />176'. Cement was also used to create a surface plug <br />Comments M. P. = 1.18' <br />Flans called cor this ~:r11 to b.. ce,r..pl~c.~d :nto t}~e <br />F;adge overburden inscuad ~~i t`iu cual ~~am. <br />• <br />7-1-56 <br />