My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE104100
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE104100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:57:26 PM
Creation date
11/24/2007 10:47:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
11/10/2005
Section_Exhibit Name
3.0 Project Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. ~, <br />Irrespective of these possible areal changes, regrading activities will establish <br />approximately the contours shown on Map M12 even though the actual regraded areas <br />may not coincide exactly with the areas shown on the map. <br />The majority of areas at Trapper Mine that have been mined or will be mined are <br />on the north slope of Che Williams Fork Mountains. As demonstrated by the post- <br />mining topography map, mining and subsequent regrading operations will not affect <br />the overall slope of the land. The final postmining graded slopes will not be <br />uniform, but they wi21 approximate the general nature of the premining topo- <br />graphy. The final slopes will not be steeper than the premining slopes in any <br />general area, and they will be graded to the mast moderate and favorable gradi- <br />ents practicable Co promote stability and effective revegetation. <br /> On occasion, in order to maximize coal recovery, overburden may be removed by <br /> other than draglines. The material will be placed on mined-out ar eas or at the <br /> ends of a cut on areas which have been stripped of topsoil, but not otherwise <br /> disturbed. Once the m ining operation necessary for coal removal is complete, <br /> these spoil piles will be handled in such a fashion that they Mead into and com- <br />• element the surrounding pos[mine topography. <br />Regrading will continue to be perfo rn <br />men[ with occasional assistance From <br />steeper than one vertical to three <br />areas where the original slopes were <br />essary in these instances. <br />led predominantly by dozers or similar equip- <br />the draglines. Regraded slopes will not be <br />horizontal ~Iv:3h) except for a few small <br />steeper. Slopes up to 1v:2.25h may be nec- <br />Frgm past experience, this type of regrading results in stable ground upon which <br />further reclamation activates such as topsoil replacement and revegetation are <br />readily accomplished. Moreover, the final regraded topography blends into the <br />surrounding natucal ground. <br />An .important aspect of regrading activities that complements spoil stabilization <br />.is the re-establishment of drainage patterns similar to those before mining with <br />REVISION <br />3-42 APB/~P~7 <br />DA?E ` <br />ir„o -Tat r, <br />
The URL can be used to link to this page
Your browser does not support the video tag.