Laserfiche WebLink
3.3 DRILLING <br />3.3.1 Types of Drilling <br />Ac Trappuc Mine there are three types of drilling: blast hole drilli~;g, exp2oca- <br />tion drilling and development drilling. Blast hole drilling occurs only m~ithia <br />the p@rmLC area and is tequirad for the blasting operation. Tha holes are heeded <br />for pLacemettt of explosives to fragment overburden, interburden and eCa1. Holes <br />sizes, depths and spacings vary according to the thickness and nature of the <br />material to be blasted. Because the holes are dzill@d just ahead of, o: within <br />an advancing pit, they are removed by stripping or mining within eeveral hmnths <br />or less. For more detail on blasting, sec Section 3.4. <br />Exploration drilling occurs outside the permit area and is required in determine <br />the ektent of the coal reserves and to provide information on coal depthr ibirk- <br />ness and quality. A11 exploration drilling is conducted ih comAliance wiLb <br />applicable U.S, Bureau of Land Management and State of Colorado regulations and <br />will be handled by separate permits, <br />Development drilling ir, required to provide data for ¢lanning pit dimensions, <br />sequencing activities and equipment scheduling. Typically, development dzitling <br />is conducted st nr neat the projected coal cropline and the economic stripping <br />limit ahead. of advancing pits and where new pits are planned within the permit <br />area. Drilling depths needed to further define the cropline are usually only to <br />the coal in question- Depending upon the information obtained, drilling may be <br />conducted defining Che cropllne.to within 25 feet horizontally. The economic <br />stripping Limit is defined in much the same manner except it is not necessarily <br />located as accurately as the cropline. <br />Prior to stripping, the overburden is drilled and blasted. Overburden drilling <br />and blasting precedes stripping by one to five pit widths. Before the overburden <br />is drilled and blasted, the topsoil is removed. Topsoil rermoval is conducted <br />during the fair weather months of May throughOctober. Therefore, each year's <br />M a-zz i{~ViSf4F( <br />APFRaV~fJ <br />/n~z _ ~ y <br />R~11S~D FHB 1 D'88 <br />