Laserfiche WebLink
1 <br />i <br />1 <br />1 <br />1 <br />1 <br />1 <br /> <br />EXHIBIT E (Cont'd) <br />Reclamation Timetable. The reclamation phases listed <br />below may be correlated to map Exhibits D-1 and F. The phases <br />correspond to the mining stages and are numbered accordingly. <br />Note that these are estimates only and that variations may <br />occur. <br />RECLAMATION TIh1ETABLE <br /> Estimated Acres t <br /> Bank <br /> Slope <br />Reclamation Below Revege- <br />Phase Years Total Water Water Road tation <br /> <br />B.L. -- 7.22* 4.94* 1.58* --* 2.28* <br />0 1979-1983 9.10 7.62 1.71 0.24 1.24 <br />I 1984-1988 6.20 5.39 1.38 -- 0.81 <br />II 1989-1993 5.81 5.47 0.70 -- 0.34 <br />III 1994-1998 7.19 5.45 0.94 -- 1.74 <br />IV 1997-2001 3.83 3.05 0.60 -- 0.78 <br />Y 1997-2001 8.25 -- -- 0.86 7.39 <br /> <br />TOTALS 40.38 26.98 5.33 1.10 12.30 <br />*Not included in total affected lands <br />14 <br />