Laserfiche WebLink
• • <br />TABLE 111-9 <br />CONSTRUCTION PRIORITY AND SUMMARY OF COSTS <br />RECOMMENDED ROUTES <br />Construction R.O.W. Relocation Construction 7ota1 <br />Priority Description Length Cost Cost Cost Cosl <br /> East of Somerset <br />1 Mile 18.0 18.6 No Build 0.60 0 0 <br /> Mile 18.6 21.94 Build 3.34 328 31 4,672 5,031 <br />2 East of Paonia to Somerset 4.% 325 28 6 <br />402 6 <br />755 <br /> Mile 13.04 - 78.0 , , <br />3 E of Hotchkiss to E of Paonia 10.34 0 0 2 <br />068 068 <br />2 <br /> Mile 2.7-13.04 , , <br />4 West of Paonia Dam 3.36 134 0 652 786 <br /> Mile 21.94 - 25.3 <br />5 Hotchkiss ey-pass 2.70 380 36 4 <br />074 4,490 <br /> Mile 0 - 2.7 , <br /> TOTAL PROJECT 25.30 1,167 95 18,868 19,130 <br />Costs are in E7,000, estimated in 1976 dollars. <br />