My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE104016
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE104016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:57:23 PM
Creation date
11/24/2007 10:42:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997027
IBM Index Class Name
Permit File
Doc Date
1/11/1997
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~olorado Division of Minerals and Geology • <br />ESTIMATING FORM - BULLDOZER WORK <br />Task #: 3 Prep. by: RCO Task File Name: M027-3 <br />Date: 06/11/91 Permit #~: M-97-027 Mine: Moonscape Pit <br />Permit Action: Final reclamation <br />Task Description: Topsoil replacement <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9N Horsepower: 370 <br />Blade Type: SEMI-UNIVERSAL -------- <br />Attachment #1: ROPS Cab Shift Basis: 1/day <br />Attachment #2: 3-shank ripper ------- <br />Cost Breakdown: <br />------------- Utilization % <br />Ownership cost/hr 548.37 N/A <br />Operating d overhaul cost/hr- dozer = 574.14 100 <br />-ripper = 50.00 0 <br />Operator Lost/hr = 522.95 N/A <br />Total egpt. unit cost/hr = 5145.46 Total fleet cost/hr: 5145.46 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />Volume: 5.035.0 CCY Factor: 1.125 Volume: 5.664.4 LCY <br />Source of quantity take-off: Application maps <br />Source of est. swell factor: program <br />HOURLY PRODUCTION <br /> Job Condition Correction Factors <br />Avg. push distance: 100 ft. ----------------------- ---- -- <br />--- ---- - Operator.......... 0 .75 (avg.) <br />Unadjusted hourly Mat. consistency.. 1 .00 (Cat tbl) <br />dozer production: 1099 LCY/hr Dozing method..... 1 .00 (gen.) <br />---- --- - Visibility........ 1. 00 (avg.) <br />Material consistency: Job efficiency.... 0. 83 (lsh/day) <br />Consolidated stockpile Spoil pile factor. 0. 70 (fnd-mf) <br />------------------------ ---- -------- Push gradient..... 1. 05 (Cat tbl) <br />Avg. push gradient: 2.00 % (neg) Altitude deration. 1. 00 (Lat tbl) <br />---- ---- - Material weight... 1. 00 (Cat tbl) <br />Avg. site altitude: 5100 ft. Blade type........ 1. 00 (S.SU.U) <br />Material weight 2300.00 ib/LCY Net Job Correction 0. 46 <br />Mat. Descr.: ---- ----- -- ---- -- <br />GENERAL FILL Adjusted Unit Prod.: 500. 75 LCY/hr <br /> Adjusted Fleet Production: 500. 75 LCY/hr <br />JOB COST ---- ---- -- <br />Fleet size 1 Dozers) Total Job Time: 11. 31 Hours <br />Unit Cost SO 290 /LCY Total Job Cost: 51 .645. 44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.