My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE104016
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE104016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:57:23 PM
Creation date
11/24/2007 10:42:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997027
IBM Index Class Name
Permit File
Doc Date
1/11/1997
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION COST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No. Task Description I Lost (f) <br />--------I-------------------------------------------I----------- <br />I n/a I <br />I I <br />I I <br />I I <br />Subtotal (K): <br />L. DRILL HOLE/MONITORING WELL SEALING <br />Task No.l Task Description Cost (S) <br />--------I------------------------------------------------I------------ <br />I n/a I <br />I I <br />I I <br />I I <br />---------------------------------------------------------------------- <br />Subtotal (L ): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No. Task <br />-------- I ----------------------- Description <br />-------------------------- I Cost <br />------- (f) <br />----- <br />I <br />I Demolition I <br />I <br />4 Seeding incl. fert, mulch, etc. I f7 ,092 <br />Fencing I <br />5 J Mob/Demob from Delta J f1 .952 <br /> Subtotal (M): f9 .044 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): 516 .812 <br />II. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No. <br />- Item Description <br />--- <br />----- <br />-- <br />-- Cost (f) <br />------ <br />------ <br />- <br />1. --------- <br />------------ <br />-- <br />I <br />I Public Liability Insurance.... ---------- <br />---- <br />1.550% of dir. I---- <br />-- <br />f261 <br />2. I Contractor's Performance Bond 0.975% of dir. f164 <br />3. Contractor's Profit........... 10.00% of dir. 51,681 <br />4. Job Superintendent.. I <br />Subtotal (A): f2.306 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 d P): f18.918 <br />B. DMG PROJECT ADMINISTRATION EXPENSES <br />Item No. Item Description Cost (S) <br />I I <br />1. Minerals Program Adm 5.00% of Intr. f946 <br />NET INDIRECT COST PERCENTAGE: 18.15% Subtotal (B): <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): <br />6946 <br />f3.052 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): f19.864 <br />
The URL can be used to link to this page
Your browser does not support the video tag.