Laserfiche WebLink
<br />G. Settling pond <br />( 1. Place overburden, l2" on 2 ac <br />2. Place topsoil, 6" over 2 ac <br />3. Seed and mulch <br />H. Lakeshore~nal graded with topsoil <br />1. Place topsoil above water level, 6" over 2 ac <br />2. Seed and mulch <br />1. Lakeshore seeded <br />1. Seed and mulch <br />Disturbance Costs <br />Contractor Mob/Demob (8%) <br />Overhead (18.5%) <br />Administrative (5%) <br />Total Proposed Financial Warranty <br />Disturbed Acreage <br />Financial Warranty per Acre <br />C <br /> <br />Qty Units Unit Cost <br />3,230 CY $I.25 <br />1,615 CY $1.25 <br />2 AC $800 <br />Qty Units Unit Cosi <br />1,615 CY $1.25 <br />2 AC $800 <br />Qt}' Units Unit Cost <br />2 AC $800 <br />$ 3;65+17~rc'1 <br />$ 13,074 1~~.'= <br />$ 3,533 -, ~;, <br />$ 93;30 i ~'- . , <br />26 <br />$ 3;5-74' # : ~~ <br />L-2 <br />