My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE103950
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE103950
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:57:20 PM
Creation date
11/24/2007 10:38:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
7/31/2007
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate RN2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 078 <br />Date : 10/16/2006 <br />User : JRS <br />State :Colorado <br />County :Delta <br />Permit/job # : C-96-083 <br />Abbreviation :none <br />Site :Bowie No. 2 Mine Filename : C083-078 <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or other job action :Permit Renewa102 <br />Task description :Finish Grade Gob Pile #2 <br />_;. <br />HOURLY EQUIPMENT COST <br />Basic machine :CAT 14H <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Attachment no. 1 : NA <br />Attachmenlno.2:NA <br />Ownership cost/hour <br />Grader operating cosUhour <br />Ripper operating cosUhour <br />OperatorcosUhour <br />Total unit cosUhour <br />Horsepower: 215 <br />Shift basis : 1 perday <br /> <br /> <br />$36.52 Data source : (CRG) <br />Utilization <br />NA <br />$45.93 100 <br />$0.00 NA <br />$24.47 NA <br />$106.92 Total fleetcosUhour: $106.92 <br />Total area to be graded or ripped : 21.30 acres <br />Source of estimated acreage :Permit Volume 9 <br />HOURLY PRODUCTION <br />Selected application :Finish grading (0-2.5 mph) <br />Average grader speed : 1.25 mph <br />Selected blade angle : 30 degrees' ' at o degrees, blade is perpendicular <br />Effective blade length : 12.10 feet to direction of travel. <br />Width of blade overlap per pass : 2.00 feet <br />Net grading or ripping width per pass : 10.10 feet " "widU or ripper beam on ripping applications <br />Unadjusted hourly unit production : 1.5303 acres/hour <br />Job Condition Correction Factors Source <br />Average site altitude : 6,100 feet Altitude adjustment factor : 1.00 (Cat HB) <br /> Job efficiency adjustment factor : 0.85 (1sh/d, mod.) <br /> Net job correction : 0.8500 multiplier <br />Adjusted hourly unit production : 1.3008 acres/hour <br />Adjusted hourly Fleet production : 1.3008 acreslhour <br />JOB TIME AND COST <br />Fleet size : 1 grader(s) <br />Total job time : 16,38 hours <br />Unit cost : $82,20 per acre Total job cost : $1,751 <br />
The URL can be used to link to this page
Your browser does not support the video tag.