Laserfiche WebLink
Truck/Loader Team Work cont'd Task # : 060 sheet 2 of 2 <br />Loatlina 7ool~Cvcle Time~~: Number of loading tool passes required to fill truck : ~~ 6 passes ~ ~~ <br />Excavators and front shovels -machine cycle time vs. job condition rating : SEVERE <br />-selected value within basic rating : SEVERE <br />Track loaders -material descr.: NA <br />-cycle time elements (min.) : Load : NA Maneuver : NA Dump : 0.100 <br />Wheel and track loaders -unadjusted basic loader cycle time (load, maneuver, and dum{ NA minutes <br />Cycle Time Factors Loading Condition Description Factor (min.) Source <br />Material: NA NA NA <br />Stockpile: NA NA NA <br />Truck ownership : NA NA NA <br />Operation : NA NA NA <br />Dump target : NA NA NA <br /> Net cycle time adjustment : NA minutes <br /> Adjusted loader cycle time (total time per loader pass) : 0.570 minutes <br /> Net load time per truck ` : 2.950 minutes <br />TrUCk (;VCIe Time : ' bulk of 1st loatler cycle completetl during Yuck exchange If atlj. Icader cycle time ~ exchange time <br />Truck exchange time'": 0.70 minutes........ Adjusted for site altitude : 0.700 minutes <br />Truck load time: 2.950 minutes........ Adjusted for site altitude : 2.950 minutes <br />Truck maneuver and dump time: 1.10 minutes........ Adjusted for site altitude : 1.100 minutes <br />^ set at 0 if exchange time < adj. loader rycle time (track exchange completed during 1st loader cycle) <br />Truck travel (haul 8 return) time: Road condition :Firm, smorNh, rolling, dirt orlight Surfaced, watered, maintained <br />Haul route <br />Road <br />segmentx Haul distance Grade <br />res. (9'0) Rolling <br />res. (9'0) Total <br />resistance (%) Speed Travel time ` <br />(minutes) <br />1 750 10.00 3.00 13.00 678 1.134 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route : Haul time "` : 1.134 <br />1 750 -10.00 3.00 -7.00 3512 0.272 <br />'navel time shown for earn segment includes accele2tioNtlersleration adlusMerrt Retufn time`": 0.272 <br />^ total haul antl return time shown includes altitude atljusanent Total truck cycle time : 6.156 <br />minutes <br />minutes <br />minutes <br />Loading tool unit production : 595.48 LCY/hour...... Adjusted for job effciency : 494.25 LCY/hour <br />Truck and production : 353.07 LCYlhour...... Adusted forjob efficiency : 293.05 LCY/hour <br />Optimal no. trucks/loading tool : 2 trucks........... Selected no. trucks/loader: 2 trucks <br /> Adjusted hourly truck team production : 586.09 LCY/hr <br /> Adjusted hourly single truckAOader team production : 494.25 LCY/hr <br /> Adjusted hourly multiple truck loader team production : 494.25 LCY/hr <br />JOB TIME AND COST ~~~ ~ -~ ~~ ~~~~ - ~~~ - ~~~~~ ~ ~~ ~~~ - ~~~~~ ~~ <br />Fleet size : 1 Team(s) Total job lime : 142.76 Hours <br />Unit wst: $1.035 /LCY Total job cost: $73,001 <br />