My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE103950
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE103950
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:57:20 PM
Creation date
11/24/2007 10:38:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
7/31/2007
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate RN2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Task # : 059 State :Colorado <br />Date : 10/16/2006 County :Delta <br />User : JRS Site :Bowie No. 2 Mine <br />Permitfjob # : C-96-083 <br />Abbreviation :none <br />Filename : C083-059 <br />Agency or organization name : Colorado Division Of Minerals And Geology <br />Permit or other job action :Permit Renewal 02 <br />Task description :Rip Upper Haul Road Asphalt Prior to Road Narrowing <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU Horsepower : 405 <br />Blade type : Semr-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :1-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $57.63 NA <br />Dozer operating cost/hour : $104.98 100 <br />Ripper operating cosUhour : $12.43 100 <br />Operalor cosUhour : $32.53 NA <br />Total unit cost hour : $207.57 Total fleet cosUhour : $830.29 <br />MATERIAL QUANTITIES <br />Alternate methods - <br />Seismic : 6,600 BCY Load factor <br />Area : NA <br />acres Rip depth (ft) <br />Source of estimated quantity :Division Estimate <br />Source of estimated load factor : NA <br />HOURLY PRODUC71ON <br />NA Bank volume : 6,600 BCY <br />NA Volume : NA BCY or CCY <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity : 5,000 feeVsecond Unadjusted production <br />Unadjusted production : 445.80 cu. yds./hour per selected method : 445.80 cu. yds./hour <br />Area : Avg. ripping depth : NA feeUpass Site altitude : 6, 800 feet <br />Average ripping width : NA feeUpass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : NA feeUpass Job efficiency factor : 0.83 (1 shiff/day) <br />Average dozer speed : NA feeUminute Net job wrrection : 0.83 multiplier <br />Average maneuver time : NA minutes/pass <br />Production per unit area : NA acres/hour Adjusted unit production : 370.01 cu. yds./hour <br />Unadjusted production : NA cu. yds./hour Adjusted fleet production : 1,480.05 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 4 dozers) Total job time : 4.46 hours <br />Unit cost : $0.561 per cu. yd. Total job cost : $3, 703 <br />Selected estimating method : Seismic <br />
The URL can be used to link to this page
Your browser does not support the video tag.