Laserfiche WebLink
CIRCES Cost Estimatino Software <br />PROJECT IDENTIFICATION <br />Task # : 055 <br />Date : 10/16/2006 <br />User : JRS <br />Slate :Colorado <br />County :Delta <br />Site :Bowie No. 2 Mine <br />PermiUjob # : C-96-083 <br />Abbreviation :none <br />Filename : C083-055 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Permit Renewal 02 <br />Task description :Rip Haul Roads (Portion Being Reclaimed) and Old Truck Loadout <br /> <br />_. <br />HOURLY EQUIPMENT COST ;; <br />:.. <br /> Basic machine : Cat D9R - 9SU Horsepower : 405 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : BOPS Cab Shift basis : 1 perday <br /> Attachment no. 2 :1-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $57.63 NA <br /> Dozer operating cosUhour : $104.98 100 <br /> Ripper operating cosUhour : $12.43 100 <br /> Operator cosUhour : $32.53 NA <br /> Total unit cosUhour : $207.57 Total fleet cosUhour : $830.29 <br />MATERIAL QUANTITIES <br /> Selected estimating method : Seismic <br />Alternate methods - <br />Seismic : 260,481 BCY Load factor : NA Bank volume : 260,481 BCY <br />Area : NA acres Rip depth (ft) : NA Volume : NA BCY or CCY <br /> <br />Source of estimated quantity :Operator Estimate <br />Source of estimated load factor:NA <br />HOURLY PRODUCTION <br />Alternate methods - Jo Condition Correction Factors - <br />Seismic : Seismic velocity : 5,000 feeVsecond Unadjusted production <br />Unadjusted production : 445.80 cu, yds.fhour per selected method : 445.80 cu. yds./hour <br />Area : Avg. ripping depth : NA feeUpass Site altitude : 6,500 feet <br />Average ripping width : NA feeUpass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : NA feeUpass Job efficiency factor : 0.83 {1 shiff/day) <br />Average dozer speed : NA feeUminute Net job correction : 0.83 multiplier <br />Average maneuver time : NA minutes/pass <br />Production per unit area : NA acres/hour Adjusted unit production : 370.01 cu. yds./hour <br />Unadjusted production : NA cu. yds./hour Adjusted fleet production : 1,480.06 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 4 tlozer(s) Total job time : 175.99 hours <br />Unit cost : $0.561 per cu. yd. Total job cost : $146,126 <br />