Laserfiche WebLink
CIRCES Cost Estimatinu Software <br />PROJECT IDENTIFICATION <br />Task # : 050 <br />Date : 10/16/2006 <br />User: JRS <br />State :Colorado <br />County :Delta <br />Site :Bowie No. 2 Mine <br />PermiUjob # : C-96-083 <br />Abbreviation :none <br />Filename : C083-050 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Permit Renewal 02 <br />Task description :Rip Train Loadout Facilities and Railbed Benches <br />,,, .:: <br />_:.: <. <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosVhour : $56.94 NA <br />Dozer operating cosUhour : $104.98 100 <br />Ripper operating cosUhour : $9.97 100 <br />Operator cosVhour : $32.53 NA <br />Total unit cosUhour : $204.43 Total fleet cosUhour : $817.70 <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 22.00 acres Rip depth (ft) : 2.63 Volume : 93,347 BCY or CCY <br />Source of estimated quantity :Division Estimate <br />Source of estimated load factor : NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity : NA feeUsecond <br />Unadjusted production : NA cu. yds./hour <br /> <br />Area : Avg. ripping depth : 2.63 feeVpass <br />Average ripping width : 7.67 feeVpass <br />Average ripping length : 100.00 feeVpass <br />Average dozer speed : 88,00 feet/minute <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.762 acres/hour <br />Unadjusted production : 3,233.41 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 4 dozers) <br />Unit cost : $0.076 per cu. yd. <br />Unadjusted production <br />per selected method : 3,233.41 cu. yds./hour <br />Site altitude : 5,900 feet <br />Altitude adjustment ; 1.00 (Cat HB) <br />Job efficiency factor; 0.83 (ishifi/day) <br />Net job correction : 0.83 multiplier <br />Adjusted unit production <br />Adjustetl fleet production <br />Total job time <br />Total job cost <br />