Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 047 <br />Date : 10/16/2006 <br />User : JRS <br />State :Colorado <br />County :Delta <br />Site :Bowie No. 2 Mine <br />Permitfjob # : C-96-083 <br />Abbreviation :none <br />Filename : C083-047 <br />Agency or organization name :Colorado Division O/Minerals And Geology <br />Permit or other job action :Permit Renewal 02 <br />Task description :Rip D-Portal Bench <br />:.; ,:: ,. <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Horsepower: 405 <br />Shin basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $56.94 NA <br />Dozer operating cost/hour : $104.98 100 <br />Ripper operating cosUhour : $9.97 100 <br />OperatorcosUhour : $32.53 NA <br />Total unit cosf/hour : $204.43 Total fleet cosUhour : $817.70 <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Loatl factor : NA Bank volume : NA BCY <br />Area : 9.00 acres Rip depth (ft) : 2.63 Volume : 38,188 BCY or CCY <br />Source of estimated quantity :Map 15-2 <br />Source of estimated load factor : NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity <br />Unadjusted production <br />Area : Avg. ripping depth <br />Average ripping width <br />Average ripping length <br />Average dozer speed <br />Average maneuver time <br />Production per unit area <br />Unadjusted production <br />NA feeUsecond <br />NA cu. yds./hour <br />2.63 feet/pass <br />7.67 feeUpass <br />50.00 feeUpass <br />88.00 feet minute <br />0.25 minutes/pass <br />0.646 acres/hour <br />2, 739.42 cu. yds./hour <br />Unadjusted production <br />per selected method : 2,739.42 cu. yds./hour <br />Site altitude : 6,800 feet <br />Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shiWday) <br />Net job correction : 0.83 multiplier <br />Adjusted unit production : 2,273.72 cu. yds./hour <br />adjusted fleet production : 9,094.88 cu. yds./hour <br />JOB TIME AND COS7 <br />Fleet size : 4 dozers) Total job time : 4.20 hours <br />Unit cost : $0.090 per cu. yd. Total job cost : $3,433 <br />