Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 043 State :Colorado Permitfjob # : C-96-083 <br />Date : 16-Oct-2006 County :Delta Abbreviation :none <br />User : JRS Site :Bowie No. 2 Mine Filename : C083-043 <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or other job action :Permit Renewa102 <br />Task description <br />HOURLY EQUIPMENT COST <br />Horsepower: 240 <br />Shift basis : 1 per day <br /> Utilization % Data source : (CRG) <br />Cost Breakdown : Ownership cosUhour : $49.43 NA <br />Operating cosUhour : $59.54 100 <br />Operator cosUhour : $32.53 NA <br />Total unit cosUhour : $141.50 Total fleet cosUhour : $141.50 <br /> <br />,. <br />;: ,:.: <br />MATERIAL QUANTITIES <br />: <br /> <br />;: <br />Loose Shrinkage Compacted <br />volume: 200,000 LCY factor : 0.900 volume: 180,000 CCY <br />Source of estimated volume : Paoe 2.05-95 <br />Source of estimated shrinkage factor :CAT Handbook <br />HOURLY PRODUCTION <br />Unadiusted hourly oroduction = (W x S x L x Cl / P <br />Compacted width per pass (W) <br />Average compactor speed (S) <br />Compacted thickness of each lift (L) <br />Conversion constant (C) <br />Required number of machine passes (P) <br />Unadjusted hourly unit production <br />Job Condition Correction Factors <br />Site altitude : 6,100 feet <br />JOB TIME AND COST <br />Fleet size : 1 compactor(s) <br />Refuse on Gob Pile #2 <br />Machine description :CAT 815E <br />Compactor type :Pad Foot <br />6.42 feet <br />4.00 mph <br />12.00 inches <br />16.3 (5,280 ft./12 in./27 cu.ft.) <br />1,674.34 CCY/hr <br /> Source <br />Altitude adjustment factor : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shiR/day) <br />Net job correction : 0.83 multiplier <br /> <br />Adjusted hourly unit production : 1,389.70 CCY/hr <br />\djusted hourly Fleet production : 1,389.70 CCY/hr <br />Total job time : 129.52 hours <br />Unit cost : $0.102 per CCY Total job cost : $18,328 <br />