My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE103950
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE103950
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:57:20 PM
Creation date
11/24/2007 10:38:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
7/31/2007
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate RN2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 040 State :Colorado <br />Date : 16-Oct-2006 County :Delta <br />User : JRS Site :Bowie No. 2 Mine <br />Permiffob # : C-96-083 <br />Abbreviation :none <br />Filename :C083-040 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Permit Renewal 02 <br />Task description :Compact Material Hauled to Gob Pile #1 <br />Machine tlescription :CAT 815E Horsepower ; 240 <br />Compactor type :Pad Foot Shift basis ; 1 perday <br /> Utilization % Data source : (CRG) <br />Cost Breakdown : Ownership cosUhour : $49,43 NA <br />Operating cosUhour: $59.54 100 <br />Operator cost/hour : $32.53 NA <br />Total unn cosUhour . $141.50 Total fleet cosUhour ; $141.50 <br />MATERIAL QUANTITIES - <br />Loose Shrinkage Compacted <br />volume : 14,349 LCY factor : 0.875 volume : 12,555 CCY <br />Source of estimated volume :Total of All Material Hauled to Gob Pile <br />Source of estimated shrinkage factor :CAT Handbook <br />HOURLY PRODUCTION <br />Unadiusted houdv oroduction = (W x S x L x C) ! P <br />Compacted width per pass (VV) : 6.42 feet <br />Average compactor speed (S) : 4.00 mph <br />Compacted thickness of each lift (L) : 8.00 inches <br />Conversion constant {C) : 16.3 (5,280 R./12 in./27 cu.ft.) <br />Required number of machine passes {P) : 3 passes <br />Unadjusted houdy unit production : 1,116.22 CCY/hr <br />Job Condition Correction Factors <br />Site altitutle : 6,400 feet <br />Altitude adjustment factor <br />Job efficiency factor <br />Net job correction <br />Adjusted hourly unit production <br />Adjusted hourly fleet production <br />Source <br />1.00 (CatHB) <br />0.83 (1 shifUday) <br />0.83 multiplier <br />926.47 CCY/hr <br />926.47 CCY/hr <br />JOB TIME AND COST - - - - <br />Fleetsize : 1 compactor(s) Total job time : 13.55 hours <br />Umt cost $0 153 per CCY Total job cost : $1 918 <br />:a ..,:: :~~~, , ~:,:. <br />
The URL can be used to link to this page
Your browser does not support the video tag.