My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE103950
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE103950
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:57:20 PM
Creation date
11/24/2007 10:38:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
7/31/2007
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate RN2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 024 <br />Date : 10/13/2006 <br />User: JRS <br />Agency or organization name : Colorado Division Of Minerals And Geology <br />Permit or other job action :Permit Renewa102 <br />Task description : Reglade BOffOW Area <br />HOURLY EQUIPMENT COST <br /> Basic machine :Cat D9R - 9SU Horsepower : 405 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $56.94 NA <br /> Operating cosUhour : $104.98 100 <br /> Ripper op. cosUhour : $0.00 0 <br /> Operator cosUhour: $32.53 NA <br /> Total unit cosUhour : $194.45 Total fleet cost/hour : $777.82 <br /><:..... > <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 25,600 BCY factor: 1.250 volume : 32,000 LCY <br /> <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance: 175 feet <br />Unadjusted hourly production : 805.3 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 0.00 % (I <br />Average site altitude : 6,200 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />Operator skill : 0.75 <br />Material consistency : 0.90 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.87 <br />Blade type : 1.00 <br />Net correction : 0.39 <br />HB) <br />HB) <br />Adjusted unit production : 313.15 LCY/hr <br />Adjusted fleet production : 1,252.81 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 4 Dozers) Total job time : 25.55 Hours <br />Unit cost : $0.621 /LCY Total job cost : $19,871 <br />State :Colorado <br />County :Delta <br />Site :Bowie No. 2 Mine <br />PermiTfjob# : C-98-083 <br />Abbreviation :none <br />Filename : C083-024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.