Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimatinta Software <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />022 State :Colorado PermiUjob # : C-98-083 <br />10/16/2006 County :Delta Abbreviation :none <br />JRS Site :Bowie No. 2 Mine Filename : C083-022 <br />Permit or other job action :Permit Renewa102 <br />Task description :Replace Fill from Material Sforage Area to Water Tank Bench <br />;: <br />_:: <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 perday <br />Cost ere <br />Scraper work team -Scraper :ICat 627G w/push-pull <br />-Push dozer:NA <br />Support equipment -Load area : NA <br />-Dump area :NA <br />Road maintenance -Motor grader :NA <br />-Water truck :NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scrape2 NA NA NA NA NA <br />Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cosUhour : $49.73 NA NA NA NA NA <br />Operating cosVhour: $130.19 NA NA NA NA NA <br />Ripper op.cosUhour: NA NA NA NA NA NA <br />OperatorcosUhour: $24.95 NA NA NA NA NA <br />Unit subtotals : $204.87 NA NA NA NA NA <br />Number of units : 2 0 0 0 0 0 <br />Group subtotals : Work : $409.74 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $409.74 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 700 CCY factor : 1.165 volume : 818 LCY <br />Source of quantity take-off :Operator Estimate <br />Source of estimated swell factor :CAT Handbook <br />