My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE103950
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE103950
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:57:20 PM
Creation date
11/24/2007 10:38:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
7/31/2007
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate RN2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJ EC71 D ENTI FICATION <br />Task # : 020 <br />Date : 10f13f2006 <br />User : JRS <br />State :Colorado <br />County :Delta <br />Site :Bowie No. 2 Mine <br />Permitfjob# : C-96-083 <br />Abbreviation :none <br />Filename : C083-020 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Permit Renewal 02 <br />Task description : Regrade Material Storage Area from TR-29 <br />HOURLY EO IPMENT COST <br /> Basic machine :Cat D9R - 9SU Horsepower : 405 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosVhour : $58,94 NA <br /> Operating cosUhour : $104.98 100 <br /> Ripper op.cosUhour : $0.00 0 <br /> Operator cosUhour : $32.53 NA <br /> Total unit cosUhour : $194.45 Total fleet cosUhour : $777.82 <br /> <br />MATERIAL QUANT171ES <br />Initial Swell Loose <br />volume : 500 CCY factor : 1.165 volume : 582 LCY <br /> <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br /> <br />HOURLY PRODUCTION ;; <, <br />Job Condition Corection Factors ,, <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 200 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 700.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Materia{ consistency description : Job efficiency : 0.83 (1shiWday) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rij <br /> Push gradient : 0.90 (Cat HB) <br />Average push gradient : 5.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,000 feet Material weight : 0.79 (Cat HB) <br /> 81ade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.32 <br />Weight description : <br />Decomposed rock - 509; Rock, 50•~ Earfh Adjusted unit production <br />Adjusted fleet production <br />224.75 LCY/hr <br />898.99 LCYIhr <br />JOB TIME AND COST <br />Fleet size : 4 Dozers) Total job time : 0.65 Hours <br />Unit cost : $0.865 lLCY Total job cost : $504 <br />
The URL can be used to link to this page
Your browser does not support the video tag.