• approximate depth of 5U feet using a Central Mine Equipment Drill No. 45 <br />or its equivalent. The truck-mounted drill will be driven to sites 1, <br />4, 5, 6 and 7 on existing roads as shown on Attachment A. No <br />improvements to these roads will be necessary. In order to access sites <br />2, 3, 8 and 9 a trail will be brushed to the sites. Vegetation will be <br />brushed to ground level to allow passage of the rig. No topsoil will be <br />stripped. No drill pads or mud pits will be necessary. <br />Holes 1, 2, 4, 6 and 7 will backfilled with cuttings. Holes 3, 5, 8 and <br />9 are anticipated at this time to be completed as water monitoring <br />wells. They will be cased and gravel-packed and sealed with a bentonite <br />seal and cap at the top to prevent surface water inflow. These four <br /> wells will each be marked by three painted fence posts. Well permits, <br />• if necessary, will be obtained from the Colorado State Engineer' s office <br />prior to usage. <br />Bond for the reclamation of these water monitoring wells will be posted <br />as part of the reclamation costs for the refuse disposal site. <br />• -3 - <br />