Laserfiche WebLink
-3- <br />detemrined: <br />b) 'Ihe Board will alter the lands to perform reclamation only if the Board has <br />i. that reclamation required by law to have bees perfom~ed upon such lands has <br />not bear performed, and <br />ii. that financial wartauty forfeiture proceedings described in the Act or similar <br />provisions of subsequent laws, if any, have beer initiated. <br />c) 'Itre Division, acting for the Board, will etrter (ands to respond to an emergarcy only <br />where the Division detennmes that any of the conditions of Construction Material Rule 8.4.2. exist. <br />'n "Itre additional conditions set fordr in the attached rider, if any, are incorporated herein by <br />referarce. <br />/ / a) Rider is attached. <br />/ XX / b) No rider is attached. <br />MINED LAND RECLAMAITON BOARD <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />MIC B. LONG /~ _ ~ <br />Division Director ~ ~. M <br />