EXHIBIT L—Reclamation Cost <br /> 1. Reclamation Costs: After a period of4 to 5,Years the site will have reached a point of <br /> maximum disturbance and final reclamation activities will commence. It is estimated that a <br /> total of three weeks w ill be required for the final reclamation of the site. Approximately 100 <br /> hours of bulldozer time will be required to establish the 3:1 slopes, remove and incorporate <br /> haul road and ramp areas, provide a final grade and place topsoil. An additional week is <br /> estimated for seedbed preparation and seeding. Total reclamation costs are as follows: <br /> Bulldozer (incl. Mob) - 100 hours @ 130/hour = $13,000.00 <br /> Tractor (with disc) - 40 hours @ 95/hour = $3800.00 <br /> Tractor(with seed drill) - 30 hours @ 90/hour = $2700.00 <br /> Seed Mix - 144.4 PLS for 38 acres = $ 815.00 <br /> Compost material - 100/ac for 38 acres = $ 3800.00 <br /> Compost application 10 hrs- Tractor&spreader 110/hr— S 1100.00 <br /> Total = S 25,215.00 <br /> Contingency Cost 18.5% = $4665 <br /> Administrative Costs 5% = S 1494 <br /> Total estimated reclamation cost = S31,374.00 <br /> This cost estimate includes fuel, mobilization, operator and associated labor. <br /> Find attached USDA recommended seed mix,seed mix cost estimate and USDA Reclamation <br /> Standards and Specifications/Technical Guidelines. It is anticipated that there will be <br /> concurrent reclamation activities carried out on portions of the site as operationally feasible. <br /> With concurrent reclamation activities, the total reclamation costs will be less than that <br /> estimated above. <br />