Laserfiche WebLink
STATE OF COLORADO <br />Roy Romer, Oovsmor <br />DEPARTMENT OF NATURAL RESOURCES <br />DIVISION OF WILDLIFE <br />• w+ Eoua orromuNin EwLOVetI <br />JOhn W. Mlmme, Dkeelor <br />BOSO BfOedWay <br />Denver, Colorado 80216 <br />Talsptrorw:l303) 287-1782 <br />Bill Fehr <br />Agile Stone Systems <br />6435 S. Porniac Ct. <br />Englewood, CO 80l 11 <br />RE: A®le Stone Systems <br />Bridge Design <br />Fih: No. M-97-054 <br />Dear Mr. Fehr: <br />30 Nov 97 <br />REFER TO <br />Fnr Wildlife - <br />For People <br />The Division of Wildlife (DOW) has reviewed the conswction drawings for bridge designs <br />associated with the Agile Stone Systems 112 Conatnrction Materials Operation permit. We <br />appreciate your efforts in providmg DOW this information. <br />Fn our 20 Aug 97 letter W the Division of Mmerala and Geology, DOW indicated concern that the <br />• proposed road crossings which bisect Tallahassee Creek could potemially impact fish movement <br />and spawning activity. The rarrrent design to `ridge"_the road crossings adequately addresses . <br />these concerns and should mitigate potential impacts. Based on our review, DOW anticipates <br />minimal impacts to fish movement aad spawning activity. <br />If yw have any additional gw~tioos concerning these comments, please give me a call at <br />(7]9)561-4909. <br />Sincerely,( <br />Chris Kloster <br />Habitat Biologist <br />CDOW; Pueblo <br />~~~~ by <br />Ron Desilet <br />Regional Manager <br />CDOW; Southeast <br />ce: lames Stevens (DMG), Larry Oehler (DMG), D. Finch (CDOW), T. Speeze (CDOW) <br />• DEPARTMENT OF NATURAL RESOURCES, Jarrgs S. Loohhsed, E><acuHve Director <br />WILDLIFE COMMISSION, Artgld Salerar, Chairman ~ Rebecca L. Frank, Vics Chelr ~ Mark LeVeAey, Secretary <br />LOWS F. Swat, Member a Jews LenBSkm Boyd, Jc, Member <br />WWlem R. He8bsr8, Member ~ JoM Sb9p. Member ~ James R. Long, Member <br />