My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE103828
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE103828
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:57:15 PM
Creation date
11/24/2007 10:28:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981024
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 7 NPDES PERMIT INFORMATION PART 1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />PART I <br />Page 11 <br />Permit No. COC-850000 <br />B. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS <br />3. Monitorine Requirements <br />In order to obtain an indication of the probable compliance or <br />noncompliance with the effluent limitations specified in Part I.B.1, <br />the permitcee shall monitor all effluent parameters at the following <br />frequencies. <br /> <br />a) Active Mining Oucfall(s) <br />Effluent Parameter Measurement Freauencv ~/ Samole Twe <br />Flow, MCD Weekly Instantaneous <br /> or Continuous <br />pH, s.u. Weekly Grab <br />Oil and Grease, mg/1 Weekly Visual J <br />To cal Suspended Solids, mg/1 Monthly Grab <br />Total Iron, mg/1 Monthly Grab <br />Settleable Solids, ml/1 g/ Monthly Grab <br />Total Dissolved Solids, mg/1 J* Quarterly Grab <br />Total Phosphorus (as P), mg/1** Quarterly Grab <br />b) Post-Mining Oucfall(s) <br />Effluent Parameter Measurement Frecuency ~ Samole Twe <br />Flow, MGD Monthly Instantaneous <br /> or Continuous <br />Settleable Solids, ml/1 g/ Monthly Grab <br />Oil and Grease, mg/1 Honchly Visual e/ <br />pH, s.u. Honchly Grab <br />Total Dissolved Solids, mg/.1 J* Quarterly Grab <br />Total Phosphorus (as P), mg/1** Quarterly Crab <br />* Total Dissolved Solids (TDS) monitoring is required only for discharges to <br />the Colorado River Basin. See specific facility certification rationale <br />to determine whether TDS monitoring is required. "' <br />** Total phosphorus monitoring is required only for discharges to the Dillon <br />Reservoir drainage area (i.e., Ten Mile Creek, Snake River, Slue River, <br />and all other tributaries to the Dillon Reservoir) and for discharges co <br />the Upper Bear Creek drainage area. See specific facility certification <br />rationale co determine whether phosphorus monitoring is required. <br />See Part I.B.4, for footnotes <br />
The URL can be used to link to this page
Your browser does not support the video tag.