Laserfiche WebLink
REVEGETATION CALCULATIONS -DRILL SEEDED AREAS <br />GREASEWOOD SHRUBLAND <br />• <br />AREA TO BE REVEGETATED 5.0 ACRES <br />TASK DESCRIPTION - Scarify, harrow, seed, mulch, crimp, and <br />fertilize as necessary in second season <br />TILLING/SEEDBED PREPARATION <br />METHOD : Chisel plowing <br />Harrowing <br />SEEDING -SEE TABLE 3.4-1a FOR SEED MIX <br />METHOD : Drill <br />SEED RATE 15.21 pls/acre <br />MULCHING <br />MATERIAL Native hay or straw <br />MULCH RATE 2 <br />COST $lfON $106.65 <br />• <br />• <br />SPREADING RATE 2 ton/acre <br />CRIMPING <br />FERTILIZING <br />AREA TO BE COVERED 2.5 acres (50 °~ OF AREA) <br />MATERIAL USED 10/20/10 at $0.16 per Ib <br />RATE OF COVERAGE 250 Ib per acre <br />$40.00 per acre @ 50 <br />APPLICATION METHOD broadcast <br />$20.91 per acre @ 50 <br />DRILL SEEDING COST <br />5 ACRES TOTAL <br />TASK 21C <br />$53.95 per acre <br />$96.80 per acre <br />$60.25 per acre <br />$143.25 per acre <br />$213.30 per acre <br />$60.11 per acre <br />$41.41 per acre <br />$20.00 per acre <br />$10.46 per acre <br />$699.53 per acre <br />INITIAL DRILL SEEDING COST $3,497.63 <br />REESEEDING ASSUME 20% FAILURE $699.53 <br />TOTAL GREASEWOOD SEEDING COST = <br />TOTAL COST OF REVEGETATION = <br />$4,197.15 <br />512,327.03 <br />Mc VOL 1 - Tbl 3.7-1 TASK 21 C 11 - 19 - 98 <br />